    沙盘模型的制作需要哪些流程?
    2018-4-24 18:25:45 来源:http://www.jnsymx.com
    1、设置沙盘
    1. Set sand table
    先将沙盘框放置稳妥,好使沙盘的方位和现地一致,再铺上3-5厘米厚,湿度适当的沙土,并用木板刮平压紧,作为低等高线的平面,然后打上和地形图相应的方格,在沙盘框周围注记相应的编号。
    Put the sandbox stable first, it is best to make the position of the sand table consistent with the present, then spread the 3-5 cm thick, the appropriate sand soil, and use the board to flat and press, as the floor of the lowest contour line, then hit the corresponding square with the topographic map, and note the corresponding number around the sandbox frame.
    2、堆积地貌
    2. Accumulation of landforms
    (1)、依照方格将地形图上已选定的低等高线,能控制地貌基本形状的等高线,以及山顶,鞍部,山脚,倾斜变换点和江河等到的位置画到沙盘面上。
    (1) according to the minimum contour selected in the topographic map, the contour lines of the basic shape of the geomorphology can be controlled, and the top, the saddle, the foot of the mountain, the tilted transformation point and the position of the river are painted on the surface of the sand table.

    (2)、将计算好的山顶,鞍部,山脚,倾斜变换点和江河弯曲部等起伏明显和点,分别插上竹签.竹签的高度,为该点在沙盘上的高度加上底层沙土的厚度。

    济南模型公司

    (2) the calculated height of the top of the mountain, the saddle, the foot of the mountain, the slope of the slope and the bend of the river, etc., are undulating, and the height of the bamboo mark, respectively, is added to the height of the point on the sand plate and the thickness of the bottom sand.
    (3)、在低等到高线范围内,以竹签和等高线为依据,先堆出山顶,鞍部,山背等的概略形状作为骨干,再修整其他部分。如沙盘较大,可分片堆积,先堆积进出困难处,后堆积进出方便处.堆积时,应随时对照地形图,以正确显示地貌的起伏状况,并应随时将沙土压紧,以免崩塌变形.如有较大的江河,湖泊,应在修整地貌时一并挖成.堆积完毕,应作全面检查和修整,并从高到低逐层撒上与地面颜色相符的锯末(或喷以颜色)。
    (3) on the basis of the bamboo mark and the contour line, the outline of the mountain top, the saddle and the back of the mountain as the backbone, and then the other parts are rebuilt. If the sand plate is large, it can be stacked and piled up, and the pile is accumulated in and out of the difficult place, and then the accumulation is in the convenient place. The topographic map should be controlled at any time in order to correctly display the relief of the landforms, and the sand and soil should be pressed at any time so as not to collapse and deform. All inspections and trimming should be done, and the sawdust (or spray color) that matches the color of the ground will be sprinkled from high to low.
    3、设置地物
    3. Setting the ground objects
    沙盘上的地物,如房屋,铁路,桥梁,树木和独立地物等,多用相似的模型表示,公路和乡村路用宽窄不等,颜色不同的纸(布条)表示;江河用蓝色纸条或锯末表示;树林用小树枝或绿色锯末表示。地物的大小,应与水平比例尺相适应,关系位置要求正确。设置地物,应按水系,居民地,道路,树林和独立地物的顺序进行设置。后,在相应的位置上插上地名,江河名,山名和高程注记等纸牌。
    The ground objects on the sand table, such as houses, railways, bridges, trees and independent objects, are expressed in similar models. Road and country roads vary with wide narrow, different colors of paper (cloth strips); rivers are expressed in blue paper or sawdust; trees are represented by branches or green sawdust. The size of the ground objects should be in line with the horizontal scale, and the relationship position must be correct. To set up objects, they should be set up according to the sequence of water system, residential areas, roads, forests and independent objects. Finally, place the place names, river names, mountain names and elevation notes on the corresponding positions.
    4、设置战术情况
    4. Set up tactical situation
    战术情况,通常根据预定的作战方案或训练想定,用制式的兵棋,临时制作的队标,队号等进行设置。设置时,先设战斗分界线,而后按先敌后我,由前沿到纵深的顺序进行。如需显示敌、我设防工程时,应先设置工作设施,后设置战术情况。工业模型
    The tactical situation is usually determined according to the predetermined operational plan or training, with the standard wargame, the temporary production of team badge, team number and so on. When setting up, we first set up the combat demarcation line, and then proceed according to the order of the enemy first and then from the front to the deep. If we need to show the enemy or our fortification project, we should first set up work facilities and then set up tactical conditions. Industrial model
    5、整饰
    5, decoration
    上述各项工作完成后,应详细对照检查,并标明沙盘的名称,指北箭头和比例尺,需要时用线绳拉上坐标网。
    After the above work is completed, detailed checks should be made, and the name of the sand table should be marked, referring to the north arrow and scale. When necessary, use the rope to pull up the coordinate network.
    有了济南模型公司上面的小总结,希望对广大客户有所帮助,如果有什么不理解的或者寻求帮助的请点击我们的官方网站:http://www.jnsymx.com或者来电咨询,我们会尽全力为您解决
    With a small summary of the Ji'nan model company, we hope to be helpful to the customers. If there is anything that is not understood or for help, please click on our official website: http://www.jnsymx.com or inquire, we will do our best to solve the problem.